KnowledgeBoat Logo
|
OPEN IN APP

Chapter 11

Time & Work — Exercise 11(B)

Class - 8 RS Aggarwal Mathematics Solutions



Exercise 11B - Multiple Choice Questions

Question 1

If a work can be completed by A in 30 days and by B in 60 days, then the number of days taken by them to finish the work, working together, is:

  1. 20

  2. 25

  3. 45

  4. 50

Answer

A can complete the work in 30 days,

⇒ A's 1 day's work = 130\dfrac{1}{30}.

B can complete the work in 60 days,

⇒ B's 1 day's work = 160\dfrac{1}{60}.

⇒ (A + B)’s 1 day’s work =(130+160)=2+160=360=120\Rightarrow \text{ (A + B)'s 1 day's work }= \Big(\dfrac{1}{30} + \dfrac{1}{60}\Big)\\[1em] = \dfrac{2 + 1}{60}\\[1em] = \dfrac{3}{60}\\[1em] = \dfrac{1}{20}

∴ Both together can finish the work in 20 days.

Hence, Option 1 is the correct option.

Question 2

A can do a job in 6 days while A and B can do it together in 2 days. How many days will be taken by B to do the job alone?

  1. 3

  2. 4

  3. 5

  4. 8

Answer

A can do the job in 6 days,

⇒ A's 1 day's work = 16\dfrac{1}{6}.

A and B together can do the job in 2 days,

⇒ (A + B)'s 1 day's work = 12\dfrac{1}{2}.

B's 1 day's work = [(A + B)'s 1 day's work] − (A's 1 day's work)

⇒ B’s 1 day’s work =(12−16)=3−16=26=13\Rightarrow \text{ B's 1 day's work }= \Big(\dfrac{1}{2} - \dfrac{1}{6}\Big)\\[1em] = \dfrac{3 - 1}{6}\\[1em] = \dfrac{2}{6}\\[1em] = \dfrac{1}{3}

∴ B alone can do the job in 3 days.

Hence, Option 1 is the correct option.

Question 3

A, B and C together can finish a piece of work in 4 days. A alone can do it in 12 days and B alone in 18 days. How many days will be taken by C to do it alone?

  1. 9

  2. 14

  3. 16

  4. 21

Answer

A, B and C together can finish the work in 4 days,

⇒ (A + B + C)'s 1 day's work = 14\dfrac{1}{4}.

A alone can do the work in 12 days,

⇒ A's 1 day's work = 112\dfrac{1}{12}.

B alone can do the work in 18 days,

⇒ B's 1 day's work = 118\dfrac{1}{18}.

C's 1 day's work = [(A + B + C)'s 1 day's work] − [(A's 1 day's work) + (B's 1 day's work)]

⇒ C’s 1 day’s work =14−(112+118)=9−3−236=436=19\Rightarrow \text{ C's 1 day's work }= \dfrac{1}{4} - \Big(\dfrac{1}{12} + \dfrac{1}{18}\Big)\\[1em] = \dfrac{9 - 3 - 2}{36}\\[1em] = \dfrac{4}{36}\\[1em] = \dfrac{1}{9}

∴ C alone can do the work in 9 days.

Hence, Option 1 is the correct option.

Question 4

A and B can do a piece of work in 18 days; B and C in 24 days; C and A in 36 days. In how many days can they do it all working together?

  1. 12

  2. 13

  3. 16

  4. 26

Answer

A and B can do a piece of work in 18 days,

⇒ (A + B)'s 1 day's work = 118\dfrac{1}{18} \quad ....(1)

B and C can do the work in 24 days,

⇒ (B + C)'s 1 day's work = 124\dfrac{1}{24} \quad ....(2)

C and A can do the work in 36 days,

⇒ (C + A)'s 1 day's work = 136\dfrac{1}{36} \quad ....(3)

Adding equations (1), (2) and (3), we get :

⇒ (A + B)’s 1 day’s work + (B + C)’s 1 day’s work + (C + A)’s 1 day’s work =118+124+136⇒ (A + B + B + C + C + A)’s 1 day’s work =118+124+136⇒ (2A + 2B + 2C)’s 1 day’s work =118+124+136⇒ 2(A + B + C)’s 1 day’s work =(118+124+136)⇒ 2(A + B + C)’s 1 day’s work =4+3+272⇒ 2(A + B + C)’s 1 day’s work =972⇒ 2(A + B + C)’s 1 day’s work =18\Rightarrow \text{ (A + B)'s 1 day's work + (B + C)'s 1 day's work + (C + A)'s 1 day's work }= \dfrac{1}{18} + \dfrac{1}{24} + \dfrac{1}{36}\\[1em] \Rightarrow \text{ (A + B + B + C + C + A)'s 1 day's work }= \dfrac{1}{18} + \dfrac{1}{24} + \dfrac{1}{36}\\[1em] \Rightarrow \text{ (2A + 2B + 2C)'s 1 day's work }= \dfrac{1}{18} + \dfrac{1}{24} + \dfrac{1}{36}\\[1em] \Rightarrow \text{ 2(A + B + C)'s 1 day's work }= \Big(\dfrac{1}{18} + \dfrac{1}{24} + \dfrac{1}{36}\Big)\\[1em] \Rightarrow \text{ 2(A + B + C)'s 1 day's work }= \dfrac{4 + 3 + 2}{72}\\[1em] \Rightarrow \text{ 2(A + B + C)'s 1 day's work }= \dfrac{9}{72}\\[1em] \Rightarrow \text{ 2(A + B + C)'s 1 day's work }= \dfrac{1}{8}

Dividing both sides by 2 :

⇒ (A + B + C)’s 1 day’s work =18÷2=18×12=116\Rightarrow \text{ (A + B + C)'s 1 day's work }= \dfrac{1}{8} \div 2\\[1em] = \dfrac{1}{8} \times \dfrac{1}{2}\\[1em] = \dfrac{1}{16}

∴ All the three working together can do the work in 16 days.

Hence, Option 3 is the correct option.

Question 5

A can finish a work in 12 days and B can do it in 15 days. After A had worked for 3 days, B also joined A to finish the remaining work. In how many days the remaining work will be finished?

  1. 4124\dfrac{1}{2}

  2. 5

  3. 5125\dfrac{1}{2}

  4. 6

Answer

A can finish the work in 12 days,

⇒ A's 1 day's work = 112\dfrac{1}{12}.

B can do the work in 15 days,

⇒ B's 1 day's work = 115\dfrac{1}{15}.

A worked alone for 3 days,

⇒ A's 3 days' work = (112×3)=312=14\Big(\dfrac{1}{12} \times 3\Big) = \dfrac{3}{12} = \dfrac{1}{4}.

Remaining work = (1−14)=4−14=34\Big(1 - \dfrac{1}{4}\Big) = \dfrac{4 - 1}{4} = \dfrac{3}{4}.

As B joined A after 3 days, this work is done by A and B together.

⇒ (A + B)’s 1 day’s work =(112+115)=5+460=960=320\Rightarrow \text{ (A + B)'s 1 day's work }= \Big(\dfrac{1}{12} + \dfrac{1}{15}\Big)\\[1em] = \dfrac{5 + 4}{60}\\[1em] = \dfrac{9}{60}\\[1em] = \dfrac{3}{20}

Now, 320\dfrac{3}{20} work is done by (A + B) in 1 day.

Whole work is done by (A + B) in (1×203)\Big(1 \times \dfrac{20}{3}\Big) days = 203\dfrac{20}{3} days.

∴ 34\dfrac{3}{4} work is done by (A + B) in (203×34)\Big(\dfrac{20}{3} \times \dfrac{3}{4}\Big) days = 6012\dfrac{60}{12} days = 5 days.

Hence, Option 2 is the correct option.

Question 6

A can do a piece of work in 20 days and B can do it in 12 days. B worked at it for 9 days. In how many days A alone can finish the remaining work?

  1. 3

  2. 5

  3. 7

  4. 11

Answer

A can do a piece of work in 20 days,

⇒ A's 1 day's work = 120\dfrac{1}{20}.

B can do the work in 12 days,

⇒ B's 1 day's work = 112\dfrac{1}{12}.

B worked at it for 9 days,

⇒ B's 9 days' work = (112×9)=912=34\Big(\dfrac{1}{12} \times 9\Big) = \dfrac{9}{12} = \dfrac{3}{4}.

Remaining work = (1−34)=4−34=14\Big(1 - \dfrac{3}{4}\Big) = \dfrac{4 - 3}{4} = \dfrac{1}{4}.

This remaining work is done by A alone.

Now, 120\dfrac{1}{20} work is done by A in 1 day.

Whole work is done by A in 20 days.

∴ 14\dfrac{1}{4} work is done by A in (20×14)\Big(20 \times \dfrac{1}{4}\Big) days = 5 days.

Hence, Option 2 is the correct option.

Question 7

A works twice as fast as B. If B can complete a piece of work independently in 12 days, then the number of days taken by A and B together to finish the work is

  1. 4

  2. 6

  3. 8

  4. 18

Answer

B can complete the work in 12 days.

A works twice as fast as B, so A takes half the time taken by B.

∴ A can complete the work in (122)\Big(\dfrac{12}{2}\Big) days = 6 days.

A can complete the work in 6 days,

⇒ A's 1 day's work = 16\dfrac{1}{6}.

B can complete the work in 12 days,

⇒ B's 1 day's work = 112\dfrac{1}{12}.

⇒ (A + B)’s 1 day’s work =(16+112)=2+112=312=14\Rightarrow \text{ (A + B)'s 1 day's work }= \Big(\dfrac{1}{6} + \dfrac{1}{12}\Big)\\[1em] = \dfrac{2 + 1}{12}\\[1em] = \dfrac{3}{12}\\[1em] = \dfrac{1}{4}

∴ A and B together can finish the work in 4 days.

Hence, Option 1 is the correct option.

Question 8

A can do a piece of work in 80 days. He works at it for 10 days and then B alone finishes the work in 42 days. The number of days taken by the two together to finish the work, is

  1. 24

  2. 25

  3. 30

  4. 35

Answer

A can do a piece of work in 80 days,

⇒ A's 1 day's work = 180\dfrac{1}{80}.

A works at it for 10 days,

⇒ A's 10 days' work = (180×10)=1080=18\Big(\dfrac{1}{80} \times 10\Big) = \dfrac{10}{80} = \dfrac{1}{8}.

Remaining work = (1−18)=8−18=78\Big(1 - \dfrac{1}{8}\Big) = \dfrac{8 - 1}{8} = \dfrac{7}{8}.

B alone finishes the remaining work in 42 days,

⇒ 78\dfrac{7}{8} work is done by B in 42 days.

Whole work will be done by B in (42×87)\Big(42 \times \dfrac{8}{7}\Big) days = 48 days.

∴ B's 1 day's work = 148\dfrac{1}{48}.

⇒ (A + B)’s 1 day’s work =(180+148)=3+5240=8240=130\Rightarrow \text{ (A + B)'s 1 day's work }= \Big(\dfrac{1}{80} + \dfrac{1}{48}\Big)\\[1em] = \dfrac{3 + 5}{240}\\[1em] = \dfrac{8}{240}\\[1em] = \dfrac{1}{30}

∴ Both together can finish the work in 30 days.

Hence, Option 3 is the correct option.

Question 9

Pipe A can fill a tank in 45 hours and pipe B can fill it in 36 hours. If both the pipes are opened in the empty tank, in how many hours will it be full?

  1. 9

  2. 20

  3. 401240\dfrac{1}{2}

  4. 81

Answer

Pipe A can fill the tank in 45 hours,

⇒ Part of the tank filled by A in 1 hour = 145\dfrac{1}{45}.

Pipe B can fill the tank in 36 hours,

⇒ Part of the tank filled by B in 1 hour = 136\dfrac{1}{36}.

Taking both the pipes to be working together:

⇒ Part of the tank filled by (A + B) in 1 hour =(145+136)=4+5180=9180=120\Rightarrow \text{ Part of the tank filled by (A + B) in 1 hour }= \Big(\dfrac{1}{45} + \dfrac{1}{36}\Big)\\[1em] = \dfrac{4 + 5}{180}\\[1em] = \dfrac{9}{180}\\[1em] = \dfrac{1}{20}

∴ The tank will be full in 20 hours.

Hence, Option 2 is the correct option.

Question 10

Pipe A can fill a cistern in 4 hours while pipe B can empty it in 6 hours. If both of them are opened at the same time when the cistern is empty, the number of hours taken by them to fill it, is

  1. 6

  2. 8

  3. 10

  4. 12

Answer

Pipe A can fill the cistern in 4 hours,

⇒ Part of the cistern filled by A in 1 hour = 14\dfrac{1}{4}.

Pipe B can empty the cistern in 6 hours,

⇒ Part of the cistern emptied by B in 1 hour = 16\dfrac{1}{6}.

When both are opened together, A fills the cistern while B empties it, so the part emptied by B is subtracted :

⇒ Net part of the cistern filled in 1 hour =(14−16)=3−212=112\Rightarrow \text{ Net part of the cistern filled in 1 hour }= \Big(\dfrac{1}{4} - \dfrac{1}{6}\Big)\\[1em] = \dfrac{3 - 2}{12}\\[1em] = \dfrac{1}{12}

∴ The cistern will be filled in 12 hours.

Hence, Option 4 is the correct option.

Question 11

A cistern which has a leak in the bottom is filled in 15 hours. Had there been no leak it could have been filled in 12 hours. If the cistern is full, the leak can empty it in

  1. 3 hours

  2. 12 hours

  3. 15 hours

  4. 60 hours

Answer

Without the leak, the cistern can be filled in 12 hours,

⇒ Part of the cistern filled in 1 hour, without the leak = 112\dfrac{1}{12}.

With the leak, the cistern is filled in 15 hours,

⇒ Part of the cistern filled in 1 hour, with the leak = 115\dfrac{1}{15}.

The leak empties the difference of these two parts in 1 hour :

⇒ Part of the cistern emptied by the leak in 1 hour =(112−115)=5−460=160\Rightarrow \text{ Part of the cistern emptied by the leak in 1 hour }= \Big(\dfrac{1}{12} - \dfrac{1}{15}\Big)\\[1em] = \dfrac{5 - 4}{60}\\[1em] = \dfrac{1}{60}

∴ The leak can empty the full cistern in 60 hours.

Hence, Option 4 is the correct option.

Question 12

A cistern can be filled by pipes A and B in 4 hours and 6 hours respectively. When full, the cistern can be emptied by a pipe C in 8 hours. If all the pipes be turned on at the same time, the cistern will be full in

  1. 3 hrs 18 min

  2. 3 hrs 26 min

  3. 3 hrs 42 min

  4. 3 hrs 48 min

Answer

Pipe A can fill the cistern in 4 hours,

⇒ Part of the cistern filled by A in 1 hour = 14\dfrac{1}{4}.

Pipe B can fill the cistern in 6 hours,

⇒ Part of the cistern filled by B in 1 hour = 16\dfrac{1}{6}.

Pipe C can empty the full cistern in 8 hours,

⇒ Part of the cistern emptied by C in 1 hour = 18\dfrac{1}{8}.

When all the pipes are turned on together, A and B fill the cistern while C empties it, so the part emptied by C is subtracted :

⇒ Net part of the cistern filled in 1 hour =(14+16−18)=6+4−324=724\Rightarrow \text{ Net part of the cistern filled in 1 hour }= \Big(\dfrac{1}{4} + \dfrac{1}{6} - \dfrac{1}{8}\Big)\\[1em] = \dfrac{6 + 4 - 3}{24}\\[1em] = \dfrac{7}{24}

∴ Time taken to fill the cistern = 247\dfrac{24}{7} hours = 3373\dfrac{3}{7} hours.

Now, 37\dfrac{3}{7} hour = (37×60)\Big(\dfrac{3}{7} \times 60\Big) minutes = 1807\dfrac{180}{7} minutes = 255725\dfrac{5}{7} minutes ≈ 26 minutes.

∴ The cistern will be full in about 3 hrs 26 min.

Hence, Option 2 is the correct option.

Exercise 11B - Case Study Based Questions

Question 1

Three labourers A, B and C can individually build or break a wall in 30 days, 60 days and 20 days respectively.

  1. In how many days can A and B together build the wall?
    (a) 15 days
    (b) 20 days
    (c) 45 days
    (d) 90 days

  2. In how many days will the wall be built, if A builds it and B breaks it simultaneously?
    (a) 45 days
    (b) 60 days
    (c) 75 days
    (d) 90 days

  3. In how many days will the wall be built, if all the three labourers A, B and C are employed to build it?
    (a) 10 days
    (b) 12 days
    (c) 15 days
    (d) 20 days

  4. How many days will it take to build the wall, if A and B work together to build it while C breaks it simultaneously?
    (a) 75 days
    (b) 90 days
    (c) 120 days
    (d) The wall will never be built

Answer

1. A can build the wall in 30 days,

⇒ Part of the wall built by A in 1 day = 130\dfrac{1}{30}.

B can build the wall in 60 days,

⇒ Part of the wall built by B in 1 day = 160\dfrac{1}{60}.

⇒ Part of the wall built by (A + B) in 1 day =(130+160)=2+160=360=120\Rightarrow \text{ Part of the wall built by (A + B) in 1 day }= \Big(\dfrac{1}{30} + \dfrac{1}{60}\Big)\\[1em] = \dfrac{2 + 1}{60}\\[1em] = \dfrac{3}{60}\\[1em] = \dfrac{1}{20}

So, A and B together can build the wall in 20 days.

Hence, option (b) is the correct option.

2. A can build the wall in 30 days,

⇒ Part of the wall built by A in 1 day = 130\dfrac{1}{30}.

B can break the wall in 60 days,

⇒ Part of the wall broken by B in 1 day = 160\dfrac{1}{60}.

A builds the wall while B breaks it, so the part broken by B is subtracted :

⇒ Net part of the wall built in 1 day =(130−160)=2−160=160\Rightarrow \text{ Net part of the wall built in 1 day }= \Big(\dfrac{1}{30} - \dfrac{1}{60}\Big)\\[1em] = \dfrac{2 - 1}{60}\\[1em] = \dfrac{1}{60}

So, the wall will be built in 60 days.

Hence, option (b) is the correct option.

3. A can build the wall in 30 days,

⇒ Part of the wall built by A in 1 day = 130\dfrac{1}{30}.

B can build the wall in 60 days,

⇒ Part of the wall built by B in 1 day = 160\dfrac{1}{60}.

C can build the wall in 20 days,

⇒ Part of the wall built by C in 1 day = 120\dfrac{1}{20}.

⇒ Part of the wall built by (A + B + C) in 1 day =(130+160+120)=2+1+360=660=110\Rightarrow \text{ Part of the wall built by (A + B + C) in 1 day }= \Big(\dfrac{1}{30} + \dfrac{1}{60} + \dfrac{1}{20}\Big)\\[1em] = \dfrac{2 + 1 + 3}{60}\\[1em] = \dfrac{6}{60}\\[1em] = \dfrac{1}{10}

So, all the three together can build the wall in 10 days.

Hence, option (a) is the correct option.

4. A can build the wall in 30 days,

⇒ Part of the wall built by A in 1 day = 130\dfrac{1}{30}.

B can build the wall in 60 days,

⇒ Part of the wall built by B in 1 day = 160\dfrac{1}{60}.

C can break the wall in 20 days,

⇒ Part of the wall broken by C in 1 day = 120\dfrac{1}{20}.

A and B build the wall while C breaks it, so the part broken by C is subtracted :

⇒ Net part of the wall built in 1 day =(130+160−120)=2+1−360=060=0\Rightarrow \text{ Net part of the wall built in 1 day }= \Big(\dfrac{1}{30} + \dfrac{1}{60} - \dfrac{1}{20}\Big)\\[1em] = \dfrac{2 + 1 - 3}{60}\\[1em] = \dfrac{0}{60}\\[1em] = 0

As no part of the wall is built in 1 day, the wall will never be built.

Hence, option (d) is the correct option.

Exercise 11B - Assertion-Reason Questions

Question 1

Assertion (A): If a man can complete a work in 10 days, then he will complete 15\dfrac{1}{5} of the work in 2 days.

Reason (R): If a person can complete a work in nn days, then in 1 day he does 1n\dfrac{1}{n} of the work.

  1. Both Assertion (A) and Reason (R) are true and Reason (R) is the correct explanation of Assertion (A).

  2. Both Assertion (A) and Reason (R) are true and Reason (R) is not the correct explanation of Assertion (A).

  3. Assertion (A) is true but Reason (R) is false.

  4. Assertion (A) is false but Reason (R) is true.

Answer

If a person can complete a work in nn days, then in 1 day he does 1n\dfrac{1}{n} of the work.

∴ Reason (R) is true.

The man can complete the work in 10 days,

⇒ Man's 1 day's work = 110\dfrac{1}{10}.

⇒ Man’s 2 days’ work =(110×2)=210=15\Rightarrow \text{ Man's 2 days' work }= \Big(\dfrac{1}{10} \times 2\Big)\\[1em] = \dfrac{2}{10}\\[1em] = \dfrac{1}{5}

So, he will complete 15\dfrac{1}{5} of the work in 2 days.

∴ Assertion (A) is true, and Reason (R) is the rule used to obtain it, so it is the correct explanation of Assertion (A).

Hence, Option 1 is the correct option.

Question 2

Assertion (A): Anish can do 13\dfrac{1}{3} of a work in 5 days. Brijesh can do 12\dfrac{1}{2} of the same work in 6 days. Together they will take 6 days to complete the work.

Reason (R): Number of men to complete a work and time taken by them vary inversely with each other.

  1. Both Assertion (A) and Reason (R) are true and Reason (R) is the correct explanation of Assertion (A).

  2. Both Assertion (A) and Reason (R) are true and Reason (R) is not the correct explanation of Assertion (A).

  3. Assertion (A) is true but Reason (R) is false.

  4. Assertion (A) is false but Reason (R) is true.

Answer

13\dfrac{1}{3} of the work is done by Anish in 5 days,

⇒ Whole work will be done by Anish in (5×31)\Big(5 \times \dfrac{3}{1}\Big) days = 15 days.

12\dfrac{1}{2} of the work is done by Brijesh in 6 days,

⇒ Whole work will be done by Brijesh in (6×21)\Big(6 \times \dfrac{2}{1}\Big) days = 12 days.

Anish can do the whole work in 15 days,

⇒ Anish's 1 day's work = 115\dfrac{1}{15}.

Brijesh can do the whole work in 12 days,

⇒ Brijesh's 1 day's work = 112\dfrac{1}{12}.

⇒ (Anish + Brijesh)’s 1 day’s work =(115+112)=4+560=960=320\Rightarrow \text{ (Anish + Brijesh)'s 1 day's work }= \Big(\dfrac{1}{15} + \dfrac{1}{12}\Big)\\[1em] = \dfrac{4 + 5}{60}\\[1em] = \dfrac{9}{60}\\[1em] = \dfrac{3}{20}

∴ Together they will complete the work in 203\dfrac{20}{3} days = 6236\dfrac{2}{3} days, and not in 6 days.

∴ Assertion (A) is false.

More the number of men, less is the time taken by them to complete a work, and the product of the two remains the same. So, the number of men and the time taken vary inversely with each other.

∴ Reason (R) is true.

Hence, Option 4 is the correct option.

PrevNext