Physics
Why is a cement floor laid in small pieces with gaps in between?
Heat Energy
31 Likes
Answer
In summer when temperature rises cement expand. So a cement floor is laid in small pieces with gaps in between to allow expansion in summer and contraction in winter, otherwise the cement floor will crack.
Answered By
19 Likes
Related Questions
Why are gaps left between successive rails on a railway track?
A glass stopper stuck in the neck of a bottle can be removed by pouring hot water on the neck of the bottle. Explain why?
One end of a steel girder in a bridge is not fixed, but is kept on rollers. Give the reason.
Describe an experiment to show that liquids expand on heating.