Mathematics
Mohan takes 16 days less than Manoj to do a piece of work. If both working together can do it in 15 days, in how many days will Mohan alone complete the work?
Quadratic Equations
1 Like
Answer
Let no. of days in which Mohan can do work be x
No. of days in which Manoj can do work be x + 16
In one day, Mohan completes part of work
In one day, Manoj completes part of work
Given, both can do work in 15 days,
Since, no. of days cannot be negative,
∴ x ≠ -10.
Hence, Mohan alone completes the work in 24 days.
Answered By
3 Likes
Related Questions
In an auditorium, seats were arranged in rows and columns. The number of rows was equal to number of seats in each row. When the number of rows was doubled and the number of seats in each row was reduced by 10, the total number of seats increased by 300. Find :
(i) the number of rows in the original arrangement.
(ii) the number of seats in the auditorium after re-arrangement.
In a certain positive fraction , the denominator is greater than the numerator by 3. If 1 is subtracted from both the numerator and denominator , the fraction is decreased by . Find the fraction.
A two digit number contains the largest digit at ten's place. The product of the digits is 27 and the difference between two digits is 6. Find the number.
₹480 is divided equally among 'x' children. If the number of children were 20 more, then each would have got ₹12 less . Find 'x'.